Skip to main content

SEMZON Engineering

50 TPD Bio-Organic Phosphate Fertilizer Plant Built for Auriga BOP, Karachi

SEMZON built a 50 t/day bio-organic phosphate granulation plant for Auriga BOP in Nooriabad, Karachi – blending, granulating, drying, screening and packing.
Rotary dryer of the 50 TPD bio organic phosphate fertilizer plant built by SEMZON for Auriga BOP, Karachi

SEMZON Engineering has built a 50-ton-per-day bio-organic phosphate (BOP) fertilizer plant for Auriga BOP in Nooriabad, Karachi. The plant turns a blend of raw materials and additives into round, dry granules that are easy to spread and store.

How the granulation line works

  • Storage bins and elevators hold and lift the raw materials into the process.
  • A dual-agitator blender mixes the raw materials and additives into an even blend.
  • A rotary granulator rolls the blend into round granules.
  • Two 33 ft rotary dryers remove moisture and harden the granules; cyclones and blowers capture dust from the exhaust air.
  • A screener and rotary separator separate on-spec granules from oversize and fines, which return to the process.
  • The packing section fills the finished fertilizer into bags; belt conveyors link every stage.

Why granules instead of powder

Granulated fertilizer flows freely, does not cake as easily in storage and spreads evenly in the field. Uniform granule size also means less dust during handling and a product that looks and performs consistently from bag to bag – an important point for brands selling to farmers.

Key figures

ItemAuriga BOP plant
Capacity50 t/day
ProductBio-organic phosphate granules
DryingTwo rotary dryers, 33 ft each, with cyclones and blowers
LocationNooriabad, Karachi

The same equipment can be configured for compost, organic and NPK fertilizers. See our agricultural and fertilizer systems, the agriculture and fertilizer industry page and the full Auriga BOP project. Planning a fertilizer plant? Request a layout and quotation.

Share this article
Planning a plant?
Talk to a SEMZON engineer

Share your capacity, raw material and site details – we reply with a layout and quotation within 2 working days.

On this page
Planning a plant?
Talk to a SEMZON engineer

Share your capacity, raw material and site details – we reply with a layout and quotation within 2 working days.

Keep reading

More from SEMZON

Engineering guides, project news and industry insights from our team in Lahore.

Let’s Build Your Industrial Solution

Tell us about your capacity, raw material and site. Our engineering team will design a custom turnkey solution tailored to your exact requirements and budget.